Create Roofer RAMS in Under 10 Minutes

Pre-loaded with roofing hazards — falls from height, fragile surfaces, falling objects and more. Generate a compliant Risk Assessment & Method Statement for any roofing job.

HSE-aligned hazards
Site-ready PDF export
Digital sign-off
RAMS Builder
1
Trade
2
Job
3
Generate

What job are you doing?

Choose a common roofer job

What's Included

Everything you need for a compliant roofer RAMS

  • HSE-aligned roofing hazard library
  • Working at height controls and method steps
  • 5×5 risk matrix with pre/post controls
  • Professional PDF export with your branding
  • Digital sign-off and audit trail

Common Roofer Jobs

RAMS Builder includes guided examples for these typical roofer tasks

Tiles and slatesFlat roof felt / EPDMRoof repairsGutters and fasciasTorch-on hot worksLeadwork and flashing

Typical Hazards & Controls

Pre-loaded hazards and controls for roofer work

Falls from height (roof edge)

  • Edge protection installed
  • Harness system
  • Exclusion zone below

Fragile roof surfaces

  • Crawl boards and staging
  • Warning signs
  • Fragile roof assessment

Falling objects (tiles / tools)

  • Debris netting
  • Tool lanyards
  • Hard hat zone at ground level

Adverse weather (wind / rain)

  • Daily weather check
  • Wind stop criteria (> 23 mph)
  • Temporary covers

Torch-on hot works

  • Hot works permit
  • Fire watch 60 mins
  • Extinguisher within reach

Method Statement Steps

A typical method sequence for roofer work

  1. 1
    Set up access (scaffold / MEWP)
  2. 2
    Install edge protection and exclusion zone
  3. 3
    Strip existing coverings
  4. 4
    Repair / install deck, insulation and membrane
  5. 5
    Inspect and snag completed work
  6. 6
    Clear site and handover

Example Output

Review a fully featured roofer RAMS example with hazards, permits, COSHH, and sign-off details

Roofer example RAMS PDF

Use this example to see how the finished document can be structured before you customise it for the live site, scope, and controls.

Inline preview available on demand

Open or download the example PDF when you need it. The preview is not auto-loaded here so the page does not depend on launching PDF generation during initial render.

Frequently Asked Questions

Common questions about roofer RAMS

When should I use scaffold instead of ladders?

HSE guidance says use a working platform (scaffold tower, MEWP, or full scaffold) for any roof work. Ladders are only suitable for short-duration, low-risk access—not as a working platform.

How do I word fragile roof controls in a RAMS?

State that no person shall pass across or near a fragile surface unless suitable staging, crawl boards or platforms are provided. Reference the Work at Height Regulations 2005 Schedule 5.

What wind and rain stop criteria should be included?

Specify wind speed thresholds (typically 23 mph sustained / 35 mph gusts for general work at height). Include daily weather checks and a decision matrix for stop / continue.

Ready to Create Your Roofer RAMS?

Start from the example, customise it for the live job, and export a site-ready PDF when you're happy.