Quick answer
The short version
A site induction is a legal requirement on UK construction projects under CDM 2015, but the regulations set no fixed content list. A suitable induction covers the site-specific risks, the site rules, emergency arrangements, welfare facilities, how to report accidents and dangers, and each worker's own responsibilities. The level of detail should match the size, scope and risk of the site.
New site, a new labourer starting Monday, and someone has told you to "do a site induction". That's usually where the help ends. No template, no topic list, no hint of how long it should take or what you're on the hook for if you get it wrong.
That's the gap this guide fills. It covers what CDM 2015 actually requires and who holds the duty, then gives you a working checklist built from HSE and CITB guidance that you can adapt to your own site. It's written for small contractors and sole traders, including the jobs where you're the only contractor and the duty lands on you.
What the Law Actually Requires
The Health and Safety at Work etc. Act 1974 sits underneath everything. Section 2 requires every employer to provide the information, instruction, training and supervision needed to keep their employees safe, and a site induction is one of the most direct ways a construction employer delivers that. The employee has a duty too, under section 7: take reasonable care of yourself and others, and co-operate with your employer. That's why each worker's own responsibilities belong in the induction itself.
Who Must Give the Induction
On a project with a principal contractor, the duty sits with them. Regulation 13(4)(a) of the Construction (Design and Management) Regulations 2015 requires the principal contractor to ensure a suitable site induction is provided. In practice that usually means one induction at the site office or the gate, and every contractor's workers get the same brief before they start.
Your own duty as a contractor doesn't disappear, though. Regulation 15(8) requires a contractor to provide each worker under their control with appropriate supervision, instructions and information, and regulation 15(9)(a) says that information must include a suitable site induction where one has not already been provided by the principal contractor. So if the principal contractor's induction doesn't cover the specific risks your workers face, or doesn't happen at all, the duty comes back to you.
The case most small firms miss is the single-contractor project. Under regulation 15(5), the sole contractor on a project draws up the construction phase plan, and with no principal contractor to hand the job to, they must themselves ensure the induction is provided. On a domestic extension where you're the only firm on site, you are the duty holder, and every worker you bring onto that job, including agency labour and subbies, gets inducted by you.
What CDM 2015 Does Not Tell You
Here's the part that catches people out. CDM 2015 says the induction must be "suitable" and stops there. There's no statutory list of topics, no fixed duration, and no legally required permit or certificate for site access. Suitability is judged against the site in front of you: a ten-minute run-through can be entirely right for a small extension and hopelessly thin for a demolition strip-out next to an occupied building.
The topic lists that get passed around come from guidance rather than the regulations. HSE's L153 guidance on CDM 2015 sets out what supervision, instructions and information should look like, and CITB's CDM 2015 industry guidance lists the induction topics most sites cover. The checklist below is built from those sources. For the wider picture on roles and paperwork, see CDM 2015: what small contractors need to know.
Source-backed note
HSE note
Under CDM 2015 reg 13(4)(a) the principal contractor must ensure a suitable site induction is provided. Under regs 15(8) and 15(9)(a) a contractor must provide workers under their control with a suitable site induction where one has not already been provided by the principal contractor. On a project with only one contractor, reg 15(5) makes that contractor responsible for the construction phase plan and for ensuring the induction is provided. The regulations do not prescribe the content of the induction.
The Site Induction Checklist
Treat this as your base list rather than a script to read out. Every item maps back to HSE or CITB guidance, and you should cut, expand and reorder based on what your site actually looks like. Work through it before the worker starts, in plain English, and leave room for questions.
Checklist
- Management's commitment to health and safety on this site.
- Outline of the project and timescale.
- Who runs the site and who to go to with problems.
- Site-specific risks, such as overhead cables or fragile surfaces.
- Site rules: vehicle and pedestrian routes, PPE, temporary electrics, deliveries.
- Emergency arrangements: first aid, fire, evacuation points and assembly.
- How to report accidents, incidents and dangers.
- Welfare: toilets, washing, canteen and drying facilities.
- Housekeeping and security arrangements.
- How the workforce is consulted on health and safety.
- Each worker's own responsibility for their safety and others'.
- Where the risk assessments and method statements are kept.
- Confirmation the worker understood, with a signed record.
Tailor It to the Site
How much detail is enough depends on the size, scope and level of risk of the project. That's not a dodge, it's the actual test the guidance gives you. The induction for a ground-floor rear extension needs to cover the client still living in the house, the shared access route, and where the skip sits. It probably doesn't need a formal traffic management plan.
A demolition strip-out is a different animal. Live services that haven't been isolated yet, fragile roof surfaces, the asbestos survey, heavy plant moving in and out, and other trades working in the same footprint all need naming specifically. Same checklist, very different depth on the site-specific risks line.
Weak wording vs better wording
Weak
Better
Scale the detail, not the list
Keep the same topic list for every job and change how much you say under each heading. A small job might take the induction down to fifteen minutes. A high-risk site might need an hour plus a walk-around. The list stays, the depth changes.
One more link worth making: the site-specific risks you brief come from your risk assessment. If the induction is where workers first hear about the overhead cables, someone has to have assessed those risks first, and recorded the findings where the firm has five or more employees. That's the connection between the induction and your risk assessment and method statements, and it's why the checklist includes telling workers where those documents are kept.
Risk assessment example
- Hazard
- Overhead electricity cables crossing the site access route.
- Who may be harmed
- Your operatives, delivery drivers, and anyone guiding plant or carrying ladders on and off site.
- Controls
- Assess the risk first, then name it at induction: point the cables out on a walk-around, sign a walking route away from the span, keep plant and ladder work clear of it, and brief every new arrival again.
- Residual risk
- Low once the route is signed and the cables have been pointed out to everyone on site.
New Worker Site Inductions
A new worker gets their induction before they start work, not after they've carried a few loads and found their own way around. The induction is the entry point to the site. They hear the rules, the risks and the emergency arrangements before they pick up a tool.
The law backs that up from the other direction too. The Management of Health and Safety at Work Regulations 1999 require employers to provide adequate health and safety training when someone is recruited, and when they're exposed to new or increased risks, including a new system of work. A new site is exactly that. The induction is the site-specific layer on top of whatever training and tickets the worker already holds.
That leads to the point most worth pinning down: an induction does not make a worker competent. Regulation 15(7) of CDM 2015 stops a contractor appointing or using a worker unless that person has, or is in the process of obtaining, the skills, knowledge, training and experience for the tasks allocated. That gate sits before the induction, not after it. A fifteen-minute brief doesn't turn a groundworker into a scaffolder, and it doesn't replace the training duty under the Management Regulations either.
Important safety warning
An induction is not a competence check. A worker who lacks the skills, knowledge, training and experience for a task must not be given that task, however thorough the brief was. Regulation 15(7) puts the competence gate before the appointment, and no induction can stand in for it.
The worker's side of the deal matters too. Under section 7 of the Health and Safety at Work etc. Act 1974, every employee has to take reasonable care for their own health and safety and for others affected by what they do, and co-operate with their employer so the duties can actually be met. Say that out loud in the induction. Workers who know they're part of the system, not just the audience for it, report problems instead of walking past them.
Records and Inspection-Readiness
CDM 2015 doesn't create a duty to keep a signed induction record. That surprises people who've been handed a signature sheet on every big site they've worked on. The signature sheet is good practice, and it's your evidence, but it isn't a statutory requirement in itself.
Keep one anyway. If there's an incident, or an HSE inspector turns up, one of the first questions will be what the worker was told and when. A signed and dated record with the topics covered answers that in seconds. Without one you're relying on memory. For what else an inspector is likely to ask about, see what an HSE inspector looks for.
RAMS Builder tip
Keep the induction record with the RAMS pack for the job. When the site changes, update the risk assessment and method statement, brief the change as a toolbox talk, and log it with the induction record. The paperwork and the briefings then tell the same story if an inspector asks.
A simple sheet works: worker's name, date, the site, the topics covered, a signature, and the name of whoever gave the induction. Store it with the construction phase plan so it's findable, not filed in a van door.
Common mistakes
- Using the same generic induction for every site without covering site-specific risks.
- Treating the induction as one-off and never updating workers when the site changes.
- Keeping no record of who was inducted and when.
- Using the induction as a substitute for proper training and competence checks.
- Letting workers start on site before their induction.
- Reading through a long list once and never checking understanding.
Inductions Are Not One-Off
The entry induction covers the site as it stands on the day the worker arrives. Sites don't stand still. The scaffold goes up, the strip-out opens a new void, a different contractor moves in downstairs, the fire exit changes because the fit-out has started. The guidance is clear that further information must be given on an ongoing basis whenever the situation changes.
That's where the three layers separate. The site induction happens once, at the start. Toolbox talks cover specific topics or changes as the job moves on, and they work best short and regular rather than long and rare. Task briefings cover the method for the job in hand that day, and they usually come straight out of the method statement. For ideas your crew won't switch off for, see these toolbox talk topics.
If that sounds like the induction is just the first of many briefings, that's because it is. The induction gets the worker through the gate safely. The talks and briefings keep them safe for the rest of the job.
Compliance note
General guidance, not legal advice
This guide is general information for UK tradespeople, not legal advice. Regulations and guidance change, and every site is different, so check the current HSE guidance and get competent advice for your specific project before relying on anything here. Any induction checklist or RAMS template is a starting point: it's your responsibility to make sure it suits your actual task, site, people, equipment and materials, and to keep it reviewed as the job changes. A generic template may not be suitable without your own review.
Next step
Get your RAMS sorted
The induction is where your workers first hear the site rules and the risks, and those come straight from your risk assessment and method statements. RAMS Builder helps small contractors create clear, trade-specific RAMS that feed directly into the induction brief.